The transportation of an abnormal load through Suffolk will go-ahead next month after it was postponed. Heavy haulage operator Allelys was due to move the 71-metre long load last month, but cancelled it due to operational issues. Suffolk Highways has announced the 164-tonne transformer will move through the county on Sunday, October 6. It is the second load to be transported by the firm after operational issues also affected the delivery of another transformer, which was postponed by a week and left Ipswich Docks on Sunday, August 18 instead of the planned move on Sunday, August 11. The latest…