Black Cat Syndicate Ltd (ASX:BC8) says production and processing from its Kal East Gold Operation in Western Australia is tracking strongly and ahead of schedule, with around 110,000 tonnes of ore mined from the Myhree/Boundary open pits by October 31. At Myhree, the ore has been mined to 25 metres below the surface, with grade reconciliation following the block model to expectations, and a particular achievement with construction of ore parcels, which has occurred ahead of time. At MYSP001, following haulage and processing, 559 ounces of gold dore were produced, while at MYSP002 it was 1,940 …