Vadodara (Gujarat) [India], June 22 (ANI): The river bridge on Dhadhar River in Vadodara district of Gujarat has been completed for the Bullet Train project. The Dhadhar River bridge is 120 metres long and consists of three Full Span Girders 40 metres each. The height of the piers is 16 metre to 20 metre and the four circular piers are of 4 metre and 5 metre in diameter. This bridge is in between Bharuch and Vadodara bullet train station. There are total 24 river bridges on Bullet Train corridor (Gujarat and Maharashtra) out of which 20 are in Gujarat and four are in Maharashtra. The construct…